Skip to content

Office movesUpdated By Bradford Removal Service

Office move planning: how to move your Bradford business with less downtime

From choosing a move coordinator to booking the lift at the new building, here is how to plan an office move in Bradford so work carries on with minimal disruption.

Office desks and chairs being prepared for a move

Good office move planning is mostly about time and communication. The physical move might take a day or a weekend, but the work that decides whether it goes smoothly starts weeks or months earlier. This guide sets out the steps in order, from setting a timeline and choosing a coordinator to labelling desks and telling clients, with points that apply to offices in Bradford city centre, Shipley and the business areas around the city.

Set a timeline early

Start with the date your current lease ends or the date the new space is ready, and work backwards. A rough plan for a medium-sized office looks like this:

  • 3 to 6 months before: confirm the new premises, check lease terms, and plan any fit-out work.
  • 2 to 3 months before: appoint a move coordinator, get removal quotes, and talk to your IT provider.
  • 4 to 6 weeks before: finalise the floor plan, book the move date, and tell staff, clients and suppliers.
  • 2 weeks before: start packing archives and items you do not use day to day.
  • Final week: confirm building access, label everything, and back up all data.

Smaller offices can compress this, but the order of tasks stays the same.

Appoint one person to run it

Choose one person to own the move. They do not have to do everything, but they keep the plan, answer staff questions and are the single contact for the removal company, the landlord and the IT provider. In larger offices, a small team with one person per floor or department helps.

Survey both buildings

Walk round both sites with a notebook and a tape measure. Check:

  • Access: door widths, stairs, lifts and their size and weight limit.
  • Loading: whether there is a loading bay, a rear entrance or only a front door on the street.
  • Parking: where a van can stop. City centre streets around Little Germany, Forster Square and Manningham Lane can be tight, so plan this early.
  • Building rules: many managed buildings require lift bookings, floor protection or moves outside normal hours.
  • Power and data: the number of sockets and data points in the new space, and where they are.

Share this information with the removal company when you ask for a quote. It lets them plan the right team and vehicle.

Plan IT and phones carefully

IT is where most office moves go wrong. Bring in your IT provider early and agree:

  1. When internet and phone lines will be live at the new address. Some providers need several weeks’ notice.
  2. Who backs up data and when.
  3. Who disconnects, labels and reconnects each machine.
  4. A test plan for the first morning.

Servers and network equipment need extra care. Keep them in their own labelled crates and make sure the person who will set them up is on site when they arrive.

Make an inventory and a floor plan

List everything that is moving: desks, chairs, cabinets, IT, kitchen items, archives and anything in storage rooms. Mark what is being thrown away, sold or donated. Moving things you no longer need costs time and space.

Then draw a floor plan of the new office. Give each desk, room and area a number or colour. This becomes the basis of your labelling system.

Decide what furniture goes and what is new

An office move is a good time to review furniture. Old desks and chairs may not suit the new layout, and buying new can be simpler than moving pieces that will not fit.

  • Measure the new rooms and check the floor plan against the furniture you own.
  • Arrange delivery of any new furniture before the move, or for the day after, so it does not clash with the removal.
  • Plan how unwanted furniture will leave. Selling, donating or recycling it takes time to arrange.
  • Check whether desks need taking apart to fit through doors and lifts at the new site.

Keep staff in the loop

People cope with change better when they know what is happening. Tell staff early, share the floor plan, and give them a clear timetable for packing their desks. Explain how to get to the new office, where to park, and which bus or train serves it best. A short note about the new area, such as where to buy lunch, helps on day one.

Label everything

A clear labelling system saves hours on the day.

  • Give each person a code linked to their desk number on the floor plan.
  • Label every box, chair, monitor and pedestal with that code.
  • Use a different colour for each floor or department.
  • Put copies of the floor plan on the walls at the new site so the crew can see where everything goes.

Ask staff to pack their own desks a day or two before, and to take personal valuables home.

Tell the people who need to know

Make a list of everyone who needs your new address, and when:

  • Clients and customers.
  • Suppliers and delivery companies.
  • Your bank, insurer and accountant.
  • Royal Mail for redirection.
  • Your website, email signatures, social media profiles and online business listings.
  • Companies House if your registered office address is changing.

Choose the right time to move

Most businesses want as little downtime as possible. Evening and weekend moves mean staff can finish on a Friday and start in the new office on Monday. Bradford Removal Service is open 24 hours, 7 days, so we can work around your trading hours.

Avoid your busiest weeks, such as year end or a big product launch, and keep an eye on events that close roads in the city centre.

On moving day

  • Have the move coordinator on site at both ends.
  • Keep a box of essentials: keys, access cards, tools, cables, chargers, kettle and mugs.
  • Check each floor before the last van leaves.
  • Make sure nothing is left in storerooms, cellars or the car park.

After the move

Use the first day to test IT and phones, check for damage, and fix any desks that ended up in the wrong place. Ask staff to report problems in one place so they can be dealt with quickly.

More help with your office move

For a printable list of tasks, see our office moving checklist and safety tips. Our office removals page explains how we pack and move desks, IT and filing, and our commercial removals service covers shops, workshops and other business premises.

When you are ready, get a free quote through our quote form or call 08000862860. Tell us the size of the office, the addresses, and any access or timing limits at both sites.

Planning a move in Bradford?

Get a free, no-obligation quote, or try the cost calculator for a rough idea first.

Frequently asked questions

How far ahead should we start planning an office move?

For a small office, a few weeks can be enough. For a larger office with lots of IT, furniture and staff, start three to six months ahead, especially if you need to give notice on a lease or fit out the new space.

Can an office move happen outside working hours?

Yes. Many businesses move in the evening or at the weekend so staff can be back at their desks on the next working day. Bradford Removal Service is open 24 hours, 7 days, so out-of-hours moves can be arranged.

Who is responsible for disconnecting computers and phones?

Usually your own IT team or IT provider. They should back up data, shut down and disconnect equipment, and reconnect and test it at the new site. The removal team then packs and moves the hardware.

Ready to plan your move?

Get a free quote online in a couple of minutes, or call us any time, day or night.

CallGet Free Quote